Mechanical installation works

Equipment installation

Object: "Agria" AD

Implementation period: 2012

Scope: Delivery, installation and commissioning of service pumps.

Structural steelwork

Object: "Neochim" AD

Implementation period: 2012

Scope: Energy efficiency improvement and emission reduction of СО2 of installation АМ-76, installation of steam heater, separator installation.

Design, fabrication and erection of mechanical equipment

Object: "Duropack Trakia Papir" AD

Implementation period: 2011

Scope: Design, fabrication, delivery and erection of waste transportation installation.

Production and installation of second limestone kiln

Object: "Ognyanovo-K" AD

Implementation period: 2011

Scope: Fabrication and erection of nonstandard equipment - limestone kiln and its attached equipment, hoppers, silos, valves, filters, steel pipelines.

Construction of installation for calcification of natural gypsum

Object: "Gips" AD

Implementation period: 2011

Scope: Structural steelwork - screws, redlers, elevators, specialized equipment, hoppers, silos and inflows.

Dismantle and erection of steel structures and mechanical equipment

Object: "Emka" AD

Implementation period: 2010-2011

Scope: Dismantle of enamel machine and steel structures around it, fabrication and erection of service platforms around equipment, installation of enamel machine.

Dismantle and erection of mechanical equipment, reparation of transport equipment

Object: "Mondi Stambolijski" EAD

Implementation period: 2010

Scope: Displacement of grinder "Norman" at new position, reparation of existing conveyors for biomass.

Installation of mechanical equipment

Object: "Rubin" AD

Implementation period: 2010

Scope: Installation of tunnel kiln for glass plant.

Installation and equipment completion of mechanical installation

Object: "Ooms International", Bulgaria

Implementation period: 2010

Scope: Erection of mobile installation for production and modified bitumen, fabrication of steel structure for tank frame, complete equipment completion and assembly of installation and transport preparation.

Construction of a system for transportation and operation of coal and limestone

Object: "Sandvik Bulgaria" EOOD

Implementation period: 2009 - 2010

Scope: Erection of steel structures for galleries for conveyors, transfer towers and mechanical installation with total weight over 1200 t.

Installation of mechanical equipment

Object: "Duropack Trakia Papir" AD

Implementation period: 2009

Scope: Equipment installation for production line of white testliner.

Construction of system for coal and limestone transporting and handling, installation of excavators and loading - unloading equipment

Object: "Sandvik Bulgaria" EOOD

Implementation period: 2009 - 2010

Scope: Installation of equipment for belt conveyors, complete installation of steel structures and equipment for transfer towers and excavators in mining industry.

Construction of system for dry barking and transportation system for biomass

Object: "Mondi Stambolijski" EAD

Implementation period: 2008

Scope: Fabrication and erection of industrial equipment for barking system, fabrication and erection of barking drum, complete erection of industrial equipment along the system, galleries erection and equipment for belt conveyors for transportation and handling of biomass.

Construction of new electrostatic precipitator for "Mondi Stambolijski" EAD

Оbject: "ELWO"

Implementation period: 2008

Scope: Fabrication of new electrostatic precipitator for project of "ELWO" - Poland for the needs of "Mondi Stambolijski" EAD.

Construction of industrial installations

Object: "Amilum Bulgaria" EAD

Implementation period: 2008

Scope: Structural steelwork, starch dryer, syrup lines, fabrication and erection of chimney stack, installation of gratings.

Construction of new filter system

Оbject: "Fibran Bulgaria" AD

Implementation period: 2008

Scope: Design, fabrication and erection of system from bag filters for the needs of "Fibran Bulgaria" AD

Belt conveyor installation

Object: "Geometal" EOOD

Implementation period: 2008

Scope: Belt conveyor installation PS 1600 mm. with length 560 m. for mining complex "Elatsite Med".

Installation of mechanical equipment

Object: "SBS Buhnentehnik" GmbH

Implementation period: 2008

Scope: Installation of mechanical equipment of down stage mechanization, revision, preventive maintenance and installation of existing equipment, fabrication and erection of steel structures.

Reparation of existing filter

Оbject: "Vulkan Cement" AD

Implementation period: 2008

Scope: Reconstruction of existing filter of kiln №4 in cement plant "Vulkan Cement" - Dimitrovgrad.

Erection of fridge installation

Object: "Kamenitza" AD

Implementation period: 2008

Scope: Erection of fridge installation including fridge compressor, ammonia evaporator, evaporative condenser, etc.

Reconstruction of agregate АС72

Object: "Neochim" AD

Implementation period: 2007-2008

Scope: Structural steelwork.

Construction of installation for air separation

Object: "Linde Gas Bulgaria" EOOD

Implementation period: 2007

Scope: Mechanical installation works - complete performance of part "Mechanical - technological" installation of compressors, cooling column, vessels and equipment, pipelines and pumps.

Fabrication and construction of a new electrostatic precipitator for Mondi Stamboliyski EAD

Object: "FL Smidth"

Period: 2007

Scope: Fabrication and installation of a new electrostatic precipitator for the needs of Mondi Stamboliiski EAD, designed by FL Smidth Denmark.

Dismantle of structural steelwork from Germany and installation of the same in Bulgaria

Object: "Ceramics House" EOOD

Implementation period: 2006-2007

Scope: Dismantle of production lines for ceramic products from Germany, second installation in Bulgaria at the territory of the plant for ceramic products Straldja city.