Fabrication and installation of metal structure for a new production hall

Object: Kres-D EOOD

Period: 2019

Scope: Production and installation of metal structure for a new production building, delivery and installation of crane girders.

 

img_20190717_085731
img_20190802_103658
img_20190802_103759
img_20190802_103822
img_20190812_103351
img_20190812_103403
zaglavna