Production and installation of metal structures for stairs and platforms

Read more ...

Object: Wine cellar, Momkovo village
Period: 2022
Scope: Production and installation of steel stairs and platforms, installation of gratings and steps.

Construction of a new service stairwell of steel construction

Read more ...

Object: Imeris Minerals Bulgaria AD

Period: 2021

Scope: Production and installation of new stairwells, including new stairwells, railings, platforms and flooring from grilles.

Reconstruction of an open reinforced concrete trestle with new load-bearing metal structures

Read more ...

Object: Aurubis Bulgaria AD

Period: 2021

Scope: Production and installation of new load-bearing steel beams, restoration and rehabilitation of remaining steel and reinforced concrete elements, dismantling of existing load-bearing reinforced concrete panels.

Load-bearing metal structure for control screening installation

Read more ...

Object: Ognyanovo-K AD

Period: 2020-2021

Scope: Production and installation of metal structure for control screening installation, including fabrication and installation of stairs, platforms and railings, corrugated sheet metal flooring, installation of roofing sheet metal.

Reconstruction of service stairs and handrails

Read more ...

Object: Imeris Minerals Bulgaria AD

Period: 2020

Scope: Production and installation of new steel stairs, railings and platforms to provide access

Production of steel paths and platforms for port terminal

Read more ...

Object: Port terminal

Period: 2020

Scope: Production of steel structures for paths and access platforms.

Load-bearing metal structures for the reconstruction of a bridge over the Maritsa River, Simeonovgrad

Read more ...

Object: Steel bridge over the Maritsa river

Period: 2019

Scope: Production and installation of load-bearing metal structures and individual elements for the reconstruction of a steel bridge, delivery and installation of flooring from lattice grills.

Construction of wool processing plant

Read more ...

Object: "ADF Bulgaria" EOOD

Implementation period: 2005

Scope: Construction and erection of steel structures, mechanical installation .

Construction of a new steam boiler installation at a plywood production plant

Read more ...


Object: Velde Bulgaria AD

Period: 2019 - 2020

Scope: Partial dismantling and demolition of an old boiler room, execution of earthworks and concrete works, manufacture and installation of 110 tons of supporting metal structure for technological equipment, production of 200 tons of metal structure for boiler room.

Steel structures for TPP 3

Read more ...

Object: "Energotrans 2000" OOD

Implementation period: 2005

Scope: Installation of steel structures for limestone vessels.

Fabrication of large sized structural steelwork for asphalt mixing plants foundations

Read more ...

Subject: Fabrication of large sized structural steelwork for asphalt mixing plants foundations
Year of completion: 2017
Scope of works: Fabrication and assembly of profile structural steelwork for fixed and movable asphalt mixing plants foundations.

Fabrication of auxiliary steel works – steps, platforms, gratings, ladders

Read more ...

Subject: Fabrication of auxiliary steel works – steps, platforms, gratings, sailor ladders.
Year of completion: ongoing since 2017
Scope of works: Fabrication and preliminary assembly of asphalt mixing plants auxiliary steel works – galvanized steps, platforms, staircases and others.

Engineering, fabrication and installation of steel structures for stainless steel pipelines' scaffold bridge between the manufacturing shops

Read more ...

Subject: "Waffles Day and Night“
Year of completion: 2017
Scope of works: Engineering, fabrication and installation of stainless steel pipelines, pipe rack between existing and new manufacturing shop, insulated panels cladding.

Fabrication and installation of structural steelwork for technological tower

Read more ...

Subject: "Mondelеēz Bulgaria Production“ EOOD
Year of completion: 2016
Scope of works: Fabrication and installation of structural steelwork for chocolate storage tanks tower, supply and installation of roof and wall insulated panels, finishing assemblies.

Fabrication and installation of support structural steelwork for technological equipment for secondary electrolyte cleaning

Read more ...

Subject: „Aurubis Bulgaria” AD
Year of completion: 2016
Scope of works: Fabrication and delivery of support and auxiliary steelwork for technological equipment, erectiom of steelwork structures and equipment, fabrication and installation of pipe racks.

Complete construction of plant for raw oil production

Read more ...

Object: "New Oil" AD

Implementation period: 2014 - 2015

Scope: Fabrication and erection of steel structures for elevator tower, Mechanical installation of walkways , fabrication and erection of steel structure for "Pressing workshop" and "Unloading", scaffold bridges for steam Steel pipelines and heat Steel pipelines.